In shielded mechanized tunnelling, the annular void created during the advancement of a Tunnel Boring Machine (TBM) must be continuously filled to minimize surface settlements and ensure optimal contact between the segment lining and the surrounding soil. Two component grout is widely used in the backfilling process due to its ability to meet both operational and performance requirements. This grout system...
